Install Pictures...

Tools

site prep

anchor bolts and rebar

Tools required: Shovel, hammer and nails, level, drill gun and tape measure
Materials needed: Concrete or sacrete, rebar, tie wire, 2x4's or 2x6's and a piece of plywood.

Site preparation. Dig hole to specifications provided in engineered foundation drawing provided, frame hole as shown. Run electrical to hole.

Anchor bolts, rebar and plywood panel. Paper pattern provided for drilling through plywood. Anchor bolts shipped before sign is shipped. Connect rebar to anchor bolts as shown with tie wire.

Picture of prepared foundation.
Ready to pour concrete. 
Note electrical stub at far end of piece of plywood.

all done checking level
Close up of anchor bolts, rebar and
electrical stub.
Smoothing concrete after pouring.
Foundation poured. Form removed.   Ready for sign.

 

All done.
When we receive photos of an installed sign,
we are greatly appreciative. Installation photos
help others understand that they too can install their
sign when allowed by the local ordinance
and save on their sign investment.
   

The hardest part is identifying your install "team".  You CAN do it !

 
 

Home
Up
Changeable Letters
Install pictures


Additional photos...

Installation of premier model sign into brick wall

Forming columns Removing forms Adding cinder blocks Ready for facings Ready to set sign Adding cross All done

   Two ladies show they are more than capable...

Digging hole Drilling through template Putting nit on J-bolt Putting J-bolts through plywood Securing J-bolts Securing plywood for pouring concrete Note electrical stub

   You cannot over-engineer... it is YOUR project !

Yes...

You can do it yourselves...

...and save !
LARGE rebar cage Base prepared Pouring concrete Pole with plate Setting in place    
 
  Copyrights 2007 Cornerstone Companies LLC    Cornerstone Companies LLC   800-456-9371   America's Premier Sign Provider